Product Description
Efficient baking: It can automatically process multiple slices of toast continuously, greatly improving the baking efficiency and output, and can meet the needs of commercial places during peak hours.
Even heating: The advanced heating technology can quickly and evenly heat the bread, ensuring that each slice of bread can achieve the ideal golden color and crispy taste.
Easy operation: Just put the bread slices into the crawler and press the start button to automatically complete the baking process without manually turning the bread slices.
Durable and reliable: It is mostly made of high-quality materials and exquisite craftsmanship, with a sturdy structure that can withstand high intensity and long-term use, and is easy to clean and maintain, which can reduce operating costs.
Space saving: The chain structure design is relatively compact, with moderate size and small footprint, which can make the kitchen or work area more tidy and orderly.
Detailed Photos





Product Parameters
Name |
Model |
Voltage/PowerSize |
Size(mm) |
packing Size(mm) |
Chain Toaster |
TT-150 |
1.3kw/220v |
290x420x385mm |
480*340*370mm |
Chain Toaster |
TT-300 |
2.2kw/220v |
370*420*385mm |
480*420*370mm |
Chain Toaster |
TT-450 |
2.6kw/220v |
465x420x385mm |
520*480*370mm |
Company Profile

FAQ
Question 1: Are you manufacturer? What are your advantages?
Yes. We are manufacturer with more than 10 years' production experience. We provide customer high quality equipment machine products at very reasonable price.
Question 2: Do you accept OEM, ODM order?
Yes. We can customize machines according to customers special requirements.
Question 3:What is thedelivery time?
Generally it is 5-10 days producing the machine, or it is 15-20 days if the machine customized, alsodepends on the machine and quantity you demand.
Question 4: What is the warranty?
One year warranty, except of wear part. From the date when machine was received, any damage except of wrong operation during warranty period could be repaired freely. But the travel and hotel expenses should be paid by buyer.
Question 5: What sea port do you ship at?
Any port of China is OK.
Question 6:What is the payment term?
100%TT payment for small amount order; 50% T/T as deposit and 50% balance paid before shipment for big amount order.